With the exception of some fix up days, this concludes our time in the Tin Shen. All up I spent about 169 hours in the Tin Shed over the first 10 days of the holidays.
It was a great experiences and I learnt a lot. Thanks to the Tinmin for all there help.
In the end the jobs i feel i did in the pre-production were:- Tin Shed Supervisor/Manager
- Prop Manager
- Prop Designing Team
- Prop Building Team
- Art Detectors Assistant
- Costume Designing Team
- Costume Making Team
- Co Costume Manager
- Concept Art Team
- Script Team
- Lore Master
- Modeling, Texturing and Rigging For Pre-Vis
- Storyboard Artist
(Not all of these are official and for some of them I had help)
Praise the Colossus.
No comments:
Post a Comment