Friday, 26 June 2015

Panoramas in The Woods.

Here are some panoramas I took of the film site. They where taken with my phone so there not super high quality but they could probably work as a HDRI map if you had nothing else. You would of course need to do so work on them in Photoshop 
but still, not bad.






Another Day in The Woods.


Another day of good whether. The day went a little long but it's hard to complain 
when your in such an idyllic location.


Thai and a Tree.

Here's a look Thai's costume, it came out very nice when you take in account
 the stuff we had to make it. 
This costume was almost entirely made by the art director John, 
he did a great job marrying all the scraps we found into a one consistent costume. 



Title Test.


Here is mock-up I did for the Film title, the detector liked it so it's the one where going with.


A Day in The Woods.


Our first day of shooting in the woods. We had good weather and good times, 
thanks Aman.


Praise The Colossus.


With the exception of some fix up days, this concludes our time in the Tin Shen. All up I spent about 169 hours in the Tin Shed over the first 10 days of the holidays. 
It was a great experiences and I learnt a lot. Thanks to the Tinmin for all there help.
In the end the jobs i feel i did in the pre-production were:
  • Tin Shed Supervisor/Manager
  • Prop Manager
  • Prop Designing Team
  • Prop Building Team
  • Art Detectors Assistant
  • Costume Designing Team
  • Costume Making Team
  • Co Costume Manager
  • Concept Art Team 
  • Script Team
  • Lore Master
  • Modeling, Texturing and Rigging For Pre-Vis
  • Storyboard Artist

(Not all of these are official and for some of them I had help)

Praise the Colossus.


20 Hour for a Rain Day.

A grueling 20:30 hour day in the Tin Shed. We got everything done that we needed to 
but the lack of sleep is catching up with me. It turned out we couldn't even shot the next day but it was still good to get it all done.